Medical Factory Cooling Tower

Installation Details

Model:Vulcan S100
Installation Area:cooling tower in a medicine factory
Circulation Water Capacity:100 m3/h
Pipe Diameter:150 A

 
Download PDF

The cooling tower roof of medicine factory

The purpose:

  1. Prevents from scale
  2. Prevents from heat exchanger effectiveness loss
  3. Cleaning maintenance cost of plate heat exchanger can be reduced

 

The effect:

After Vulcan was installed for some months, the scale in the cooling tower, plate heat exchanger and the pipe become soft; and it can be removed easily with a finger.

Vulcan S100 installation

Cooling Tower Grid

 

Before Vulcan was installed: the outside of the cooling tower. After Vulcan was installed for 5 months: the scale can be removed easily with a finger.

 

Before Vulcan was installed: the inside of the cooling tower. After Vulcan was installed for 5 months: the scale has been reduced.

Plate Heat Exchanger

After Vulcan was installed for 9 months: ready open the plate heat exchanger and clean.

 

The scale on the plate heat exchanger becomes soft.

After Vulcan was installed for 9 months: the plate heat exchanger was taken apart for cleaning.

 

The scale can be easily removed.

Circulation Pipe

 

The scale in the circulation pipe can also be easily removed with a finger.