Cooling Tower Savings

Installation Details

Model:Vulcan S100
Installation Area:cooling tower for 100RT turbo chiller, 24-hour yearly operation
Circulation Water Capacity:120 m3/h
Pipe Diameter:150 A
Effect:chemical treatment reduced

Full Chemical-treatment vs. Vulcan-treatment Indicates:
Under 1 year, with Vulcan treatment is already less costly than full chemical treatment

Download PDF

Cost reduction by Vulcan 10-year warranty:

Further benefits

Electric saving: about 5-15%, by the scale prevention on the turbo chiller
Gas saving: about 5-25%, by the scale prevention on the absorption chiller
Equipment life extension: about 30-60%